KeyPlants delivered the design and construction of a new building adjacent to an existing biologics production facility. The project scope included cleanrooms in Grade D (147 sqm) with ATEX classification, installation of process equipment and clean utilities with tie-ins to existing systems, and implementation of automation solutions. The new facility and its equipment were fully integrated with the client’s existing surveillance and control systems to ensure seamless operation and compliance with regulatory standards.

 

The delivery encompassed the complete project lifecycle — from Conceptual and Basic Design through Detailed Design, Installation, Commissioning, and Qualification. This ensured full alignment with the client’s process requirements and operational objectives.

 

The project’s success was driven by KeyPlants’ extensive expertise in process and automation design, its proven ability to deliver turnkey solutions, and a close, collaborative partnership with the client throughout all project phases. This combination enabled efficient execution, high-quality outcomes, and timely project delivery.

“From conceptual study in 2021 to handover in 2025, KeyPlants delivered a new column packing extension — complete with process equipment and automation systems fully integrated into the existing plant. A testament to KeyPlants’ expertise in delivering complex, turnkey biomanufacturing projects with precision and efficiency.”

Markus Morichetto
Project Manager at KeyPlants