Award-winning expansion of Merck’s pre-filled syringe production

Project details

Client  
Merck

 

Location  
Montgomery County, PA, USA

 

Market  
Biologics

 

Solutions we provided  
Design, Off-site Construction, Delivery and Clean Room Commissioning.

Award-winning expansion of Merck’s pre-filled syringe production

KeyPlants’ project to expand production of Merck’s pre-filled syringes in Pennsylvania was named the winner of the Lean Construction Institute (LCI) Engineering Design Award 2024. The project was delivered in 13 months from start of Detail Design. 

KeyPlants designed and supplied the facility for an aseptic filling line suite, buffer preparation, formulation, CIP, VHP, material staging, and inspection. This (2,800 m2/30,140 SF) box-in-box modular facility supports vaccine filling operations and with the expansion, the project will support the production of 70 million pre-filled syringes annually. 
That rapid timeline, with its schedule certainty and predictable operational start-up were crucial elements both for Merck and the KeyPlants project team.
Merck B63A project has been awarded the Lean Construction Institute (LCI) Engineering Design Award 2024!

“This is one of the great advantages of offsite fabrication. It removes significant risks, reducing some timelines by up to 50%. It also removes other risks such as cost-of-capital risk, production risk and revenue risk.”
Johan Hallberg
KeyPlants’ Head of Project Management

Hallberg points out that offsite fabrication in a factory also makes a facility less vulnerable to variations in labor quality, which results in higher productivity, better control of cost and schedule, and higher predictability, adding, “Overall, it leads to higher quality and safety, with substantial testing off-site. Quality is consistent, because work is carried out by the same skilled workforce and tested in our ISO 9001-certified workshop.” 